Lions Gate Bridge construction starts this weekend, expect delays

0
1059

Drivers using the Lions Gate Bridge to get on and off the North Shore might want to take a different route this weekend.

The Lions Gate Bridge. File photo/Business In Vancouver

Heavy traffic volumes and delays are expected from 8 p.m. on Saturday, July 20 until 8 a.m. on Sunday, July 21 as rehabilitation work beings. Workers will be installing a temporary bridge cover and 13-metre approach ramps that will allow crews to safely work beneath the bridge deck on repairs to the north tower expansion joint.

The installation work requires single-lane alternating traffic and motors are being warned to expect delays. The sidewalks will remain open for pedestrians and cyclists.

The work is weather dependent. Drivers are advised to check drivebc.ca, or @DriveBC on Twitter, for the most up-to-date information.

Once installed the temporary cover will be safe for normal driving speeds on the corridor and drivers are encouraged to drive with the normal flow of traffic. The maintenance work on the span, which opened in 1938 and sees about 60,000 vehicles a day, is expected to be completed by October.
Vancouver Courier Logo
SHARE
Previous article37 things that made Vancouver AWESOME this week
Next articleB.C. man pleads guilty in snake venom death of two-year-old girl
The Vancouver Courier has the best community newspaper website in Canada. The Courier is known for their evocative storytelling with words and video; insightful analysis of Vancouver City Hall; daily coverage to inform your understanding of Vancouver’s real estate scene; honest but respectful year-round coverage of the Vancouver Canucks; and light-hearted and (yes, we’ll admit it) occasionally barbed insights into Vancouver life.